Jet lag, passports and travel rules · Guide + calculator Without the guesswork.

Flight Delay Compensation Time Limit

Track airline escalation and an independently confirmed national-law limit without inventing one EU-wide claim deadline. Inputs stay in your browser.

Reference toolEU 261 Flight Delay Claim DeadlineTrack airline escalation and an independently confirmed national-law limit without inventing one EU-wide claim deadline. Inputs stay in your browser.
Reference calculation

Enter your details.

Calculated locally. This L3 calculator does not load optional analytics; calculator inputs and result text stay on this page.

Section 1

Core details

Start with the information that defines this calculation.

Sun, Aug 30, 2026
Section 2

Review and confirm

Check the remaining facts before calculating.

Plain-date semantics · start date is not counted unless the result explicitly says inclusive.

Your result
Confirm the route and operating carrier before applying EU261

EU passenger-rights guidance provides an airline complaint path, but the time limit for court action varies under national law. No country preset is invented here.

Disrupted flightAug 30, 2026
Disruption recordArrival delay
EU261 route / carrier scopeUnknown
Airline claimNot yet submitted
Court / enforcement jurisdictionNot yet confirmed
Rule-version checkCurrent rule set confirmed for the flight date
National limitation ruleNot confirmed
Entered national-law arithmetic endpointAug 30, 2029Not usable as a legal deadline until all gates are confirmed
Eligibility / evidenceDelay, notice, extraordinary-circumstance or evidence issue remains
Legal entitlement and final filing deadlineNot determined by this calculator

Read before relying

Context matters.

  • Check the operating carrier, departure/arrival geography and the exact disruption facts before treating Regulation 261/2004 as applicable.
  • If the airline does not reply within two months or the response is unsatisfactory, Your Europe points travelers to the relevant national enforcement body or dispute route.
  • Passenger-rights rules are changing. Confirm the rules effective on the flight date before relying on any future-flight result.
Rule set 2.0.0

Sources & scope

Source & calculation QA reviewed

The calculation guide and this source trail show what the result means, where the rule came from and when it was last reviewed. This is source-and-calculation QA, not a claim of medical, legal, tax or other professional review; time-sensitive decisions still belong with the linked authority.

JurisdictionEU air-passenger claim workflow — route/carrier scope, airline complaint, national limitation law and current rule version control
Last reviewed2026-08-20
Next review due2027-02-20
Review scopeCalcSpan source & calculation QA
PrivacyInputs stay local · this calculator does not load optional analytics
How this calculation works

A visible path from input to answer.

Track airline escalation and an independently confirmed national-law limit without inventing one EU-wide claim deadline. The page keeps the calculation scope and its limits beside the result so the output can be checked, copied or revisited.

Calculation flow
  1. Read the record. The calculator uses Disrupted flight date, EU passenger-rights scope, Disruption record, Airline claim submission date and Court / enforcement jurisdiction and 7 additional fields supplied in the form.
  2. Apply the scope. It applies the EU air-passenger claim workflow — route/carrier scope, airline complaint, national limitation law and current rule version control reference and the explicit date, unit and counting conventions shown in the result.
  3. Expose the checkpoints. Intermediate rows, warnings and timeline events stay visible; the emphasized row identifies the primary checkpoint when one exists.
Illustrative default example Confirm the route and operating carrier before applying EU261

EU passenger-rights guidance provides an airline complaint path, but the time limit for court action varies under national law. No country preset is invented here.

  • Legal entitlement and final filing deadlineNot determined by this calculator
Defaults are an illustration only. Replace them with the record that applies to your situation.
Assumptions and scope

Calculation purpose: Track airline escalation and an independently confirmed national-law limit without inventing one EU-wide claim deadline. This is a high-sensitivity reference output; the linked authority or qualified professional controls the final decision.

Boundary behavior

Calendar inputs use plain year-month-day semantics. Leap days, month ends, date-pair order and unsupported dates are checked before the result is shown.

Rule trail

Rule set 2.0.0 · Last reviewed 2026-08-20 · Next review due 2027-02-20. The source panel below contains the linked evidence.

Questions answered

What to know before using the result.

Is there one EU-wide deadline for filing an EU261 court claim?

No. Your Europe says the time limit for court action depends on national law. The tool therefore has no preset UK, German or French period.

What does the two-month date mean?

It is an airline-response follow-up point in the Your Europe complaint path, not a universal court limitation deadline.

Does a long delay automatically guarantee compensation?

No. Route and operating-carrier scope, arrival delay, notice, extraordinary circumstances, rerouting and evidence all matter under the rules effective for the flight.